Draft a method statement from your site notes

A structured first draft in minutes, so your time goes on the engineering checks.

What most people type

write a method statement

Short prompts like this get generic answers, because the AI has to guess who you are and what you need.

A better prompt

Act as an experienced site engineer drafting a method statement for review. Use fictional or anonymised project details: no client names or site addresses. Activity: [THE ACTIVITY]. Site constraints: [SITE CONSTRAINTS]. Plant, materials and crew: [PLANT, PEOPLE AND MATERIALS]. Produce a draft with these headings: scope, sequence of works (numbered steps), key hazards and controls, hold points and inspections, and a list of information still needed. Don't invent design values, loads or standard clause numbers: mark anything I must confirm as CONFIRM. Concise bullets. End by asking me one question that would make this more useful.

Fill in the blanks

Swap each highlighted part for your own details. Here’s an example.

  • [THE ACTIVITY]
    installing a 1.2m-wide precast concrete box culvert under a farm access track
  • [SITE CONSTRAINTS]
    live stream that must keep flowing, soft clay, works window of 3 weeks, access track must reopen each evening
  • [PLANT, PEOPLE AND MATERIALS]
    20t excavator, mobile crane, 6 precast units, temporary over-pumping kit, 4-person crew

What a good answer looks like

Scope: install a precast box culvert under the track, stream kept flowing. Sequence: 1. Set up over-pumping; pump capacity (CONFIRM) 2. Temporary dams up and downstream 3. Excavate to formation in short lengths; inspect clay 4. Bedding to design level (CONFIRM spec) 5. Lift units in under a lift plan 6. Joint, backfill in layers, compact 7. Reinstate track each evening Hazards and controls: - Trench collapse in soft clay: battering or support - Lifting: appointed person, exclusion zone - Flooding: monitor flow, stop-work trigger Hold points: formation, bedding level, before backfill. Still needed: drawings, lift plan, permit status. Question: any permit conditions to add?

This is a sample answer for the example above. Yours will be different, so check it against your own facts.

Make it even better

Paste your company's method statement template so the draft drops straight into your format.

Stay safe

A draft only. A competent engineer must check, complete and approve it before use.

Learn the skill behind it

This prompt comes from the course AI for civil engineers. The next lesson to watch is “Draft a method statement from your site constraints”.

Try this in Tau

In Tau, you can fill in the blanks, run the prompt and get feedback, then watch the one-minute lesson that explains why it works. Join the waitlist for early access.